Field-mounted instrument
An instrument mounted in the plant, out where the process is. It is drawn as a plain circle, the “bubble”, with the instrument’s tag inside.
Easily confused with
- Control room instrumentA plain bubble is in the field; a line across it puts the instrument on the control room panel.
- Shared display, shared controlThe same bubble; the square around it marks a shared display and control function.
- ConnectorBoth are small circles with letters inside: an instrument tag on a P&ID, a connector label on a flowchart.
How to read it
Instruments on a P&ID are drawn as circles, called bubbles or balloons, and the lines across a bubble say where the instrument is. A plain circle with nothing across it is field-mounted. The DOE’s handbook calls it a locally mounted instrument; course notes by Peter Woolf and others define a field-mounted instrument as one physically in the field, or the plant, and not accessible to an operator in a control room. A chemical engineering course text by Jonathan Verret and others puts it as near what it is measuring.
Kuphaldt’s Lessons In Industrial Instrumentation explains that the type of bubble tells something about an instrument’s location, under the ISA standard. A bubble with a line across it is a control room instrument, and a bubble inside a square is a shared display.
Also searched as: balloon symbol, field-mounted instrument p&id symbol, field-mounted instrument symbol, instrument bubble, locally mounted instrument symbol.
This explains what a symbol represents on a diagram. Companies vary the symbols, and a diagram's own legend sheet takes precedence.
How to read the tag letters
The letters in a bubble are the instrument’s tag, and the number under them is its loop. In Kuphaldt’s account of the ISA 5.1 system, the first letter is the variable the loop measures or controls, whatever the device itself senses: every instrument in a level loop starts with L, even a transmitter that infers level from pressure. The letters after it are the functions. So FIC is a flow indicating controller, PT a pressure transmitter, TE a temperature element and LT a level transmitter, and FC-135 is a flow controller in loop 135. The DOE’s handbook builds tags the same way, from the sensed parameter, then the indicator or controller type, then the type of component.
Look-alikes
A circle with a zigzag through it is equipment, a heat exchanger, and a circle with a line leaving it at a tangent is a centrifugal pump.
Read next
- Next in P&ID symbolsControl room instrumentAn instrument on the main control panel, in the control room. It is drawn as a circle with a solid horizontal line across the middle.
- The same shape in AI labels and iconsAI iconAI-generated or AI-changed content. A badge with the letters AI, often in a circle or beside a word such as generated or modified, labels an image, video, sound or text as made or altered with artificial intelligence. The European Union publishes an official set of these icons.
More P&ID symbols
The same shape elsewhere
Browse symbols drawn with circles or letters and numbers.
Sources
- DOE Fundamentals Handbook: Engineering Symbology, Prints, and Drawings, Volume 1 of 2, DOE-HDBK-1016/1-93, January 1993, U.S. Department of Energy (University of Cambridge Engineering Department mirror), Module 2: Instrumentation; Table 1; Modifiers and Transmitters (Figure 10)
- Lessons In Industrial Instrumentation, Tony R. Kuphaldt, version 2.33, 2024 (CC BY 4.0), Tony R. Kuphaldt (ibiblio.org), 7.2 Process and Instrument Diagrams; 7.5.3 Instrument bubbles; 7.6 Instrument identification tags
- Piping and Instrumentation Diagram Standard Notation, Peter Woolf et al., Chemical Process Dynamics and Controls, section 4.2, Engineering LibreTexts, General Instrument or Function Symbols
- Piping and Instrumentation Diagrams (P&IDs), Jonathan Verret, Rebecca Qiao and Rachel Barghout, Foundations of Chemical and Biological Engineering I, section 1.8, Engineering LibreTexts, P&ID Control Symbology
Researched, edited and approved by Rory Hansen before publishing. Last reviewed October 9, 2026. How we research
Added .